The credibility of cost intelligence rests on the defensibility of its methodology — and, in the Gulf, on the strength of its confidentiality framework. This document sets out how Qeema sources, anonymises, classifies, adjusts, and refreshes its dataset. Subscribers may cite this methodology in their own client reporting.
Qeema’s dataset is compiled exclusively from live, paid construction projects executed across the United Arab Emirates and the Kingdom of Saudi Arabia. Rates are drawn from tender submissions, contract awards, variation instructions, and final accounts. No synthetic, modelled, or estimated figures are included.
Data is contributed by professional cost consultancy practices operating in the region, supplemented by publicly tendered government works where commercial terms are disclosed. Every contribution is reviewed by Qeema’s editorial team before inclusion, and rates are screened for outliers using statistical range-checking against comparable projects.
The current dataset comprises over 300,000 priced rates and $15 billion in benchmarked cost, covering asset types from single villas through to mega-scale infrastructure.
Confidentiality is the foundation of the Qeema platform. No subscriber — and no party to whom a subscriber onward-reports — is able to identify the specific project, developer, contractor, or consulting party behind any rate or benchmark in the dataset.
The following measures are applied as a matter of standing policy:
Qeema classifies all main contractors into three tiers, applied at the base date of each rate. A contractor’s tier is assessed on scale, single-project capability, client panel status, and delivery track record — not on a single metric.
Qeema classifies every employer into one of three categories reflecting ownership structure and commercial mandate.
A ministry, authority, municipality, or 100% state-owned entity acting directly as the employer. Commercial logic is driven by public mandate, not return on equity.
A state-linked or sovereign-wealth-backed commercial entity operating on a commercial basis but majority-owned or controlled by a government or ruling family investment vehicle. Corporate in form but strategic in mandate.
A privately held or publicly listed commercial developer without controlling state ownership. Decision-making is driven by commercial return and private shareholders.
Qeema uses internationally recognised classification systems, with consistent application across the dataset.
Principles of Measurement (International) — the dominant building classification in the Gulf region.
Civil Engineering Standard Method of Measurement.
RICS New Rules of Measurement 3 — for whole-life cost.
Benchmarks are published on five area bases, each suited to a different discipline. Where possible definitions follow the RICS Code of Measuring Practice 2015, with GCC-region conventions noted where they diverge. The same definitions appear as hover tooltips inside the application next to the basis filter.
Rates and benchmarks are ingested in their source currency. Qeema supports six regional currencies — four pegged to the US dollar (deterministic conversion) and two managed-float (editorial rate refreshed quarterly).
Pegged currencies:
Managed-float currencies (Q2 2026 editorial rate):
Pegged conversions are deterministic — no spot-rate risk. Float conversions use a quarterly editorial rate maintained in the platform’s currency_rates table; subscribers can see the effective date on every converted value. EGP and KWD rates are reviewed every quarterly refresh and on any material policy change.
All values are quoted exclusive of VAT (5% UAE, 15% KSA); VAT is treated as out of scope for cross-market comparison because it reflects a fiscal rather than construction-cost differential.
Construction costs across regional markets diverge in ways that a raw currency conversion cannot capture — logistics burden, market tension, labour mobility, and specialist-trade availability all differ. Qeema publishes a discipline-specific location factor per market that lets subscribers re-price any rate or benchmark as if it had been tendered in another market. Factors are expressed relative to a UAE baseline of 1.00.
UAE ↔ KSA factors are derived from matched-pair tender observation across hundreds of comparable schemes. Qeema considers these production-grade.
Qatar / Oman / Egypt / Kuwait factors are first-pass editorial estimates — informed by regional industry references (Turner & Townsend ICMS, Arcadis ICC, Aecom Construction Cost Handbook) and professional judgment, but not yet cross-validated against matched-pair tender data Qeema holds in those jurisdictions.
Subscribers using the editorial-tier factors for fee submissions, budget approvals, or any external client reporting should validate the value against their own market knowledge and any local cost intelligence available. Editorial factors are refined every quarterly refresh as Qeema ingests rates from each jurisdiction. Qeema makes no warranty as to accuracy of editorial-tier factors for transactional use.
Factor table (UAE = 1.00 baseline):
| Market | Currency | Buildings | Infra / PR | Confidence |
|---|---|---|---|---|
| UAE | AED | 1.00 | 1.00 | baseline |
| KSA | SAR | 1.12 | 1.08 | matched-pair derived |
| Qatar | QAR | 1.05 | 1.00 | editorial |
| Oman | OMR | 0.95 | 0.92 | editorial |
| Egypt | EGP | 0.45 | 0.50 | editorial · FX-sensitive |
| Kuwait | KWD | 1.18 | 1.10 | editorial |
To convert a value from market A to market B, Qeema applies factor[B] / factor[A] in USD space, then converts to the target market’s native currency. So a UAE Buildings rate normalised to KSA multiplies by 1.12 (and renders in SAR); the same rate normalised to Egypt multiplies by 0.45 (and renders in EGP).
Editorial caveats by market:
The factor is applied in dollar space — a rate is first converted to dollars via the currency peg or editorial float rate, then scaled by the factor, then converted to the target market’s currency. This keeps the adjustment currency-agnostic.
Factors exclude VAT (5% UAE, 15% KSA, 14% Egypt, others variable). Rates are quoted net of VAT so the location factor reflects construction-cost differentials only, not fiscal ones. The factor also excludes giga-project premium, which is better surfaced through the city-rollup filter.
UAE / KSA factors are reviewed every refresh cycle against matched-pair tender observations. The other four markets are editorial and refined as Qeema ingests rates from each jurisdiction. Last reviewed: 2026-04-28.
Qeema publishes six inflation series covering the UAE and KSA markets (CPI, TPI Buildings, TPI Infrastructure / Public Realm × two countries), all at quarterly resolution from 2014 Q1 through 2029 Q4, rebased so that 2020 Q1 = 100 on every series. History runs to the current quarter; forecast covers the remainder. Both the calculator and the benchmarks rebase tool operate on these series.
Construction cost pressure does not track general consumer inflation. TPI captures material prices, labour supply, contractor pricing behaviour, and project pipeline tension specific to the construction market. Qeema splits TPI by discipline because buildings and infrastructure respond very differently to material cycles (steel, cement, copper), labour migration, and giga-project demand.
Current provenance (v1.2). TPI series are literature-anchored: values are blended from published regional indices — Arcadis International Construction Costs, Turner & Townsend International Construction Market Survey, and Aecom Construction Cost Handbook — then calibrated to matched-pair tender observations by the Qeema editorial team. Forecast periods use a damped exponential trend fading toward long-run equilibrium (~3% annual for buildings, ~2.5% for infrastructure).
v1.3 roadmap — data-derived TPI. Qeema holds 243,000+ rate observations. An initial attempt to derive TPI directly from the Dubai subset (171,000 rates, 154 projects, 2018-2024) produced volatile year-over-year swings (-25% / +30%) driven by cross-project “mix effects”: our POMI classification at section + sub-section granularity is too coarse to isolate true price movement from project-composition shift. The v1.3 release will ship a data-derived TPI built on description-level canonicalisation (fuzzy clustering of rate descriptions into true basket items) following the confidentiality / PII scrub that is queued next. Both indices will be published side-by-side for transparency.
Subscribers can rebase any rate or benchmark to any target quarter (not just year). The project’s own base quarter is derived from its tender date where known; projects on award-year fallback default to Q1 of that year, with the adjustment factor displayed transparently alongside the result.
The Qeema dataset is refreshed every quarter. Each refresh includes newly contributed rates, updated inflation indices, revisions to contractor tier classifications, and editorial review of flagged outliers.
Each refresh is published with a version number (current: v1.2) and a change log detailing material additions and revisions.
No rate or benchmark is surfaced on the platform within 12 months of its tender date. Records that fall inside the 12-month window are held in a private quarantine partition — used only for editorial validation and for inclusion in aggregated statistics where the statistical floor (§02) is satisfied — and are released into the public dataset only once the lag is met.
The lag exists for two reasons. First, current-quarter tender and award detail is competitively sensitive to the parties involved; the 12-month buffer ensures Qeema doesn’t surface anything that retains live commercial value to the contributing parties. Second, the lag gives editorial team time to scrub project-identifying detail (drawing references, equipment tag numbers, room IDs) before the record reaches subscribers — see §02.
The lag applies uniformly across Buildings, Infrastructure, Public Realm, and the standalone sub-asset benchmarks (Bridges, MSE Walls, Stadia). It is enforced at the API layer, not in the source ingest — meaning records can be loaded into the platform any time but only become subscriber-visible once the threshold is crossed.
Qeema data is protected against unauthorised extraction through a layered set of controls. The goal is twofold: to make casual scraping uneconomic, and to make any genuine leak both attributable and legally actionable.
Retry-After header.Authentication wall, full honeytoken assignment, and audit log retention activate with the Clerk auth rollout. All other layers are active today on the preview platform.
Any party with verifiable standing in a project — the developer, employer, principal contractor, or appointed cost consultant — may request that records associated with that project be removed from the Qeema dataset. Qeema commits to honour every valid request without question and without requiring justification beyond proof of standing.
Process.
Scope. A removal request applies to all records derived from the named project — every individual rate, every elemental benchmark, every appearance in aggregated statistics. Where statistical aggregates would drop below the §02 floor as a result of removal, the aggregate cell is suppressed rather than recomputed on a smaller sample.
Limits. A removal request applies to records sourced from the named project only — it does not affect records sourced from other projects, even if those other projects are commercially related. It does not affect inflation indices or contractor-tier classifications, both of which are aggregate constructs derived from many underlying projects.
The removal channel is operational from launch. Qeema regards the policy as a permanent commitment to the industry and will not modify the SLA or process without 90 days’ advance notice published on this page.
The full methodology is available as a PDF white paper, suitable for citation in client reporting and internal audit files.