Back to overview
Methodology · v1.2·Last revised January 2026

How Qeema builds, classifies, and maintains its data.

The credibility of cost intelligence rests on the defensibility of its methodology — and, in the Gulf, on the strength of its confidentiality framework. This document sets out how Qeema sources, anonymises, classifies, adjusts, and refreshes its dataset. Subscribers may cite this methodology in their own client reporting.

01

Data sourcing

Qeema’s dataset is compiled exclusively from live, paid construction projects executed across the United Arab Emirates and the Kingdom of Saudi Arabia. Rates are drawn from tender submissions, contract awards, variation instructions, and final accounts. No synthetic, modelled, or estimated figures are included.

Data is contributed by professional cost consultancy practices operating in the region, supplemented by publicly tendered government works where commercial terms are disclosed. Every contribution is reviewed by Qeema’s editorial team before inclusion, and rates are screened for outliers using statistical range-checking against comparable projects.

The current dataset comprises over 300,000 priced rates and $15 billion in benchmarked cost, covering asset types from single villas through to mega-scale infrastructure.

02

Confidentiality

Confidentiality is the foundation of the Qeema platform. No subscriber — and no party to whom a subscriber onward-reports — is able to identify the specific project, developer, contractor, or consulting party behind any rate or benchmark in the dataset.

The following measures are applied as a matter of standing policy:

  • No named parties. Developer names, contractor names, consultant names, and employer names are never published, never queryable, and never referenced in any user-facing field.
  • No project names. Individual project identifiers are removed at the point of ingestion. Benchmarks are published under generic codes (e.g. Villa A · Dubai · 2024) and rates carry no project reference at all.
  • Geographic aggregation. As of 2026-04-28, location is published at country level only — UAE, KSA, or Qatar. The underlying city remains in editorial records but is no longer surfaced to subscribers on rates or benchmarks. Country-level granularity closes the {tier × asset class × city × year} re-identification surface that smaller cells leave open. Within-country cost differentials in the Gulf are typically inside 5%, smaller than the location factors that already exist between countries — analytical signal is preserved.
  • Temporal aggregation where needed. Where fewer than three comparable projects are available for a given city and year, data is published at a less granular temporal resolution until sufficient volume exists to preserve anonymity.
  • Categorical classification only. In place of named parties, every rate carries two analytical classifications: a contractor tier (T1, T2, T3) and a two-tier employer classification (Public for statutory authorities and ministries; Private for everything else, including the commercially-priced semi-government developers like Aldar, Emaar, and other Mubadala / PIF-related entities). The internal three-tier distinction (Government / Semi-Government / Private) is kept in editorial records but never surfaced to subscribers — semi-government would identify a narrow set of developers and is therefore collapsed.
  • Quantity rounding. Bill-of-quantities quantities are rounded on serve in three tiers: quantities below 10 pass through exact (rounding small counts like “1 nr lift” would distort meaning); 10 to 99 rounds to the nearest 5; 100 and above rounds to the nearest 10. A specific tendered quantity (say, 2,347 m³ of bulk excavation) is fingerprintable to its source scheme by anyone who priced that BoQ; the rounded equivalent (2,350 m³) carries the same analytical signal without the identifying precision. The underlying value is preserved in editorial records for refresh-cycle audits.
03

Contractor tier classification

Qeema classifies all main contractors into three tiers, applied at the base date of each rate. A contractor’s tier is assessed on scale, single-project capability, client panel status, and delivery track record — not on a single metric.

Tier 1
Major contractor
Annual revenue
Typically above $500m (regional operations)
Single-project capacity
Above $200m
Track record
Landmark, complex, or high-risk assets
Credentials
Established bonding, insurance, and PQQ status for government and blue-chip clients
Footprint
Regional or international parent with multi-country operations
Tier 2
Mid-market contractor
Annual revenue
Typically $100m to $500m
Single-project capacity
$25m to $200m
Track record
Mainstream commercial, residential, mid-scale hospitality, standard infrastructure
Credentials
Recognised on most developer PQQ panels
Tier 3
Regional or specialist contractor
Annual revenue
Typically below $100m
Single-project capacity
Below $25m
Track record
Low-rise residential, villa clusters, fit-outs, light commercial
Structure
Often family-owned or founder-led
04

Employer classification

Qeema classifies every employer into one of three categories reflecting ownership structure and commercial mandate.

Government

A ministry, authority, municipality, or 100% state-owned entity acting directly as the employer. Commercial logic is driven by public mandate, not return on equity.

Semi-Government

A state-linked or sovereign-wealth-backed commercial entity operating on a commercial basis but majority-owned or controlled by a government or ruling family investment vehicle. Corporate in form but strategic in mandate.

Private

A privately held or publicly listed commercial developer without controlling state ownership. Decision-making is driven by commercial return and private shareholders.

05

Classification standards

Qeema uses internationally recognised classification systems, with consistent application across the dataset.

Buildings
POMI

Principles of Measurement (International) — the dominant building classification in the Gulf region.

Infrastructure
CESMM

Civil Engineering Standard Method of Measurement.

Maintenance
NRM3

RICS New Rules of Measurement 3 — for whole-life cost.

06

Area measurement

Benchmarks are published on five area bases, each suited to a different discipline. Where possible definitions follow the RICS Code of Measuring Practice 2015, with GCC-region conventions noted where they diverge. The same definitions appear as hover tooltips inside the application next to the basis filter.

  • GIA · Gross Internal Area. Area of a building measured to the internal face of the perimeter walls at each floor level — excludes external wall thickness. The working basis for most building cost plans. Used for Buildings benchmarks.
  • GFA · Gross Floor Area. Total floor area measured to the external face of the perimeter walls. Slightly larger than GIA because external wall thickness is included. Used internationally and in regulatory filings across both jurisdictions.
  • BUA · Built-Up Area. GCC convention for total constructed area — includes external walls, balconies, terraces, and covered service areas. Typically the basis quoted on UAE developer PQQs and leasing sheets. Larger than GFA.
  • GLA · Gross Landscaped Area. Total soft and hard landscaped surface in square metres. Used as the cost basis for landscape and public-realm benchmarks. Distinct from the retail-sector sense of “Gross Leasable Area”.
  • TDA · Total Developable Area. Total land area that becomes developable as a result of an infrastructure scheme — including road corridors, serviced plots, and landscaped parcels. Used as a cost-per-m² basis on infrastructure benchmarks to express value delivered per unit of land unlocked. Surfaced separately from landscape GLA to keep the two sectors comparable without confusion.
  • ROW · Right of Way. Land corridor reserved for a road, rail, or utility scheme — including carriageway, verges, footways, and utility easements. Measured in square metres of corridor area.
06b

Currency and FX

Rates and benchmarks are ingested in their source currency. Qeema supports six regional currencies — four pegged to the US dollar (deterministic conversion) and two managed-float (editorial rate refreshed quarterly).

Pegged currencies:

  • $1 = 3.6725 AED (UAE Central Bank, unchanged since 1997)
  • $1 = 3.75 SAR (SAMA, unchanged since 1986)
  • $1 = 3.64 QAR (Qatar Central Bank, unchanged since 2001)
  • $1 = 0.3845 OMR (Central Bank of Oman, unchanged since 1986)

Managed-float currencies (Q2 2026 editorial rate):

  • $1 = 48 EGP (Central Bank of Egypt, post-March 2024 reform)
  • $1 = 0.307 KWD (Central Bank of Kuwait, basket-managed)

Pegged conversions are deterministic — no spot-rate risk. Float conversions use a quarterly editorial rate maintained in the platform’s currency_rates table; subscribers can see the effective date on every converted value. EGP and KWD rates are reviewed every quarterly refresh and on any material policy change.

All values are quoted exclusive of VAT (5% UAE, 15% KSA); VAT is treated as out of scope for cross-market comparison because it reflects a fiscal rather than construction-cost differential.

06c

Location factor

Construction costs across regional markets diverge in ways that a raw currency conversion cannot capture — logistics burden, market tension, labour mobility, and specialist-trade availability all differ. Qeema publishes a discipline-specific location factor per market that lets subscribers re-price any rate or benchmark as if it had been tendered in another market. Factors are expressed relative to a UAE baseline of 1.00.

Two confidence tiers

UAE ↔ KSA factors are derived from matched-pair tender observation across hundreds of comparable schemes. Qeema considers these production-grade.

Qatar / Oman / Egypt / Kuwait factors are first-pass editorial estimates — informed by regional industry references (Turner & Townsend ICMS, Arcadis ICC, Aecom Construction Cost Handbook) and professional judgment, but not yet cross-validated against matched-pair tender data Qeema holds in those jurisdictions.

Subscribers using the editorial-tier factors for fee submissions, budget approvals, or any external client reporting should validate the value against their own market knowledge and any local cost intelligence available. Editorial factors are refined every quarterly refresh as Qeema ingests rates from each jurisdiction. Qeema makes no warranty as to accuracy of editorial-tier factors for transactional use.

Factor table (UAE = 1.00 baseline):

MarketCurrencyBuildingsInfra / PRConfidence
UAEAED1.001.00baseline
KSASAR1.121.08matched-pair derived
QatarQAR1.051.00editorial
OmanOMR0.950.92editorial
EgyptEGP0.450.50editorial · FX-sensitive
KuwaitKWD1.181.10editorial

To convert a value from market A to market B, Qeema applies factor[B] / factor[A] in USD space, then converts to the target market’s native currency. So a UAE Buildings rate normalised to KSA multiplies by 1.12 (and renders in SAR); the same rate normalised to Egypt multiplies by 0.45 (and renders in EGP).

Editorial caveats by market:

  • UAE ↔ KSA — derived from matched-pair observation across hundreds of tendered comparables. Highest confidence.
  • Qatar — broadly similar to UAE; small premium on Buildings reflects post-2022 World Cup spec tail; Infra parity reflects competitive Qatari domestic contractor base.
  • Oman — smaller pipeline, thinner specialist-trade depth — lower Buildings cost. Bulk-civils broadly similar to UAE.
  • Egypt — significantly lower dollar-cost base reflecting local labour regime, domestic supply chains, and post-March-2024 EGP devaluation. Highly FX-sensitive; review every quarterly refresh.
  • Kuwait — restricted local labour, smaller market, more imported specialist trades. High Buildings premium; modest Infra premium.
  • SOFT_COSTS — currently 1.00 across all markets (consultant fees scale less with locality than hard cost).

The factor is applied in dollar space — a rate is first converted to dollars via the currency peg or editorial float rate, then scaled by the factor, then converted to the target market’s currency. This keeps the adjustment currency-agnostic.

Factors exclude VAT (5% UAE, 15% KSA, 14% Egypt, others variable). Rates are quoted net of VAT so the location factor reflects construction-cost differentials only, not fiscal ones. The factor also excludes giga-project premium, which is better surfaced through the city-rollup filter.

UAE / KSA factors are reviewed every refresh cycle against matched-pair tender observations. The other four markets are editorial and refined as Qeema ingests rates from each jurisdiction. Last reviewed: 2026-04-28.

07

Inflation adjustment

Qeema publishes six inflation series covering the UAE and KSA markets (CPI, TPI Buildings, TPI Infrastructure / Public Realm × two countries), all at quarterly resolution from 2014 Q1 through 2029 Q4, rebased so that 2020 Q1 = 100 on every series. History runs to the current quarter; forecast covers the remainder. Both the calculator and the benchmarks rebase tool operate on these series.

Consumer Price Index (CPI) — central-bank-tracked

  • UAE CPI — headline index published by the Federal Centre for Statistics and Analytics (FCSA), the series tracked by the Central Bank of the UAE for monetary policy. FCSA publishes monthly; Qeema re-bases to quarterly endpoints. Forecast 2025 Q3 through 2029 Q4 at CBUAE / IMF consensus of approximately 2% annual.
  • KSA CPI — headline index published by the General Authority for Statistics (GASTAT), tracked by the Saudi Central Bank (SAMA) for monetary policy. Forecast 2025 Q3 through 2029 Q4 at SAMA / IMF consensus of approximately 2% annual.

Tender Price Index (TPI) — construction-cost pressure

Construction cost pressure does not track general consumer inflation. TPI captures material prices, labour supply, contractor pricing behaviour, and project pipeline tension specific to the construction market. Qeema splits TPI by discipline because buildings and infrastructure respond very differently to material cycles (steel, cement, copper), labour migration, and giga-project demand.

Current provenance (v1.2). TPI series are literature-anchored: values are blended from published regional indices — Arcadis International Construction Costs, Turner & Townsend International Construction Market Survey, and Aecom Construction Cost Handbook — then calibrated to matched-pair tender observations by the Qeema editorial team. Forecast periods use a damped exponential trend fading toward long-run equilibrium (~3% annual for buildings, ~2.5% for infrastructure).

  • TPI Buildings (UAE) — Q1-2021 to Q2-2026 cumulative ~+40%.
  • TPI Infrastructure & Public Realm (UAE) — Q1-2021 to Q2-2026 ~+18%. Less material-shock exposure.
  • TPI Buildings (KSA) — Q1-2021 to Q2-2026 ~+50%. Giga-project pipeline (NEOM, Diriyah, Qiddiya, Red Sea Global) drives broader resource demand through the market.
  • TPI Infrastructure & Public Realm (KSA) — Q1-2021 to Q2-2026 ~+25%.

v1.3 roadmap — data-derived TPI. Qeema holds 243,000+ rate observations. An initial attempt to derive TPI directly from the Dubai subset (171,000 rates, 154 projects, 2018-2024) produced volatile year-over-year swings (-25% / +30%) driven by cross-project “mix effects”: our POMI classification at section + sub-section granularity is too coarse to isolate true price movement from project-composition shift. The v1.3 release will ship a data-derived TPI built on description-level canonicalisation (fuzzy clustering of rate descriptions into true basket items) following the confidentiality / PII scrub that is queued next. Both indices will be published side-by-side for transparency.

Subscribers can rebase any rate or benchmark to any target quarter (not just year). The project’s own base quarter is derived from its tender date where known; projects on award-year fallback default to Q1 of that year, with the adjustment factor displayed transparently alongside the result.

08

Refresh cycle

The Qeema dataset is refreshed every quarter. Each refresh includes newly contributed rates, updated inflation indices, revisions to contractor tier classifications, and editorial review of flagged outliers.

Each refresh is published with a version number (current: v1.2) and a change log detailing material additions and revisions.

08b

Time lag

No rate or benchmark is surfaced on the platform within 12 months of its tender date. Records that fall inside the 12-month window are held in a private quarantine partition — used only for editorial validation and for inclusion in aggregated statistics where the statistical floor (§02) is satisfied — and are released into the public dataset only once the lag is met.

The lag exists for two reasons. First, current-quarter tender and award detail is competitively sensitive to the parties involved; the 12-month buffer ensures Qeema doesn’t surface anything that retains live commercial value to the contributing parties. Second, the lag gives editorial team time to scrub project-identifying detail (drawing references, equipment tag numbers, room IDs) before the record reaches subscribers — see §02.

The lag applies uniformly across Buildings, Infrastructure, Public Realm, and the standalone sub-asset benchmarks (Bridges, MSE Walls, Stadia). It is enforced at the API layer, not in the source ingest — meaning records can be loaded into the platform any time but only become subscriber-visible once the threshold is crossed.

09

Data protection

Qeema data is protected against unauthorised extraction through a layered set of controls. The goal is twofold: to make casual scraping uneconomic, and to make any genuine leak both attributable and legally actionable.

  • Authentication wall. All dashboard routes sit behind authentication; anonymous access is impossible.
  • Per-user rate limiting. Every API endpoint enforces a sliding-window request cap per user session. The rates endpoint allows 60 requests per minute; benchmarks allows 30 per minute, both with hourly ceilings. Breaches return HTTP 429 with a Retry-After header.
  • No bulk export. Query pagination is capped at 100 rows per page. There is no “download CSV” endpoint. Extracting the full dataset would require thousands of legitimate-shaped requests against the rate limit, which is economically unattractive and would be logged.
  • Leak traceability. Data served to each subscriber is technically instrumented so that a leaked export can be attributed to the account that produced it. The specific mechanisms are deliberately not disclosed publicly — they are documented in the subscriber agreement.
  • Audit log. Every API request is recorded with user id, IP, route, filter parameters, and response size. The log is retained for the life of the subscription.
  • Terms of service. The subscription agreement contains an explicit no-scraping, no-resyndication clause and grants Qeema audit rights in the event of suspected leakage.

Authentication wall, full honeytoken assignment, and audit log retention activate with the Clerk auth rollout. All other layers are active today on the preview platform.

10

Data removal request

Any party with verifiable standing in a project — the developer, employer, principal contractor, or appointed cost consultant — may request that records associated with that project be removed from the Qeema dataset. Qeema commits to honour every valid request without question and without requiring justification beyond proof of standing.

Process.

  1. Submit a request to removal@qeema.info with: (a) the project’s name and approximate base year; (b) your role on the project; (c) one piece of evidence of standing — a contract page, an appointment letter, an employer reference, a board resolution, or equivalent.
  2. Qeema acknowledges within 2 working days.
  3. Editorial review verifies standing and identifies all records associated with the project across the rates and benchmarks tables. This typically completes within 5 working days.
  4. Records are suppressed from the public API within 7 working days of acknowledgement. They are moved to a quarantine partition and excluded from all subscriber views, aggregates, statistical floors, inflation calibration, and AI cost-plan training. The removal is permanent unless the requester withdraws the request in writing.
  5. A removal log is maintained internally — what was removed, when, and at whose request — for audit purposes. The log is itself confidential; it is shared only with regulatory authorities under formal request.

Scope. A removal request applies to all records derived from the named project — every individual rate, every elemental benchmark, every appearance in aggregated statistics. Where statistical aggregates would drop below the §02 floor as a result of removal, the aggregate cell is suppressed rather than recomputed on a smaller sample.

Limits. A removal request applies to records sourced from the named project only — it does not affect records sourced from other projects, even if those other projects are commercially related. It does not affect inflation indices or contractor-tier classifications, both of which are aggregate constructs derived from many underlying projects.

The removal channel is operational from launch. Qeema regards the policy as a permanent commitment to the industry and will not modify the SLA or process without 90 days’ advance notice published on this page.

Download

Methodology white paper

The full methodology is available as a PDF white paper, suitable for citation in client reporting and internal audit files.