Construction Cost & Market Intelligence for the Middle East

The Middle East’s largest and foremost construction cost & market intelligence platform.

المنصة الأكبر والأبرز لمعلومات تكاليف البناء والسوق في الشرق الأوسط

Qeema (قيمة, Arabic for value) is the Middle East’s foremost construction cost and market intelligence platform. The dataset: 250,000+ priced rates and $15 billion of benchmarked cost across over 200 projects spanning 4 million m² of Gross Floor Area, 20 million m² of Total Developable Area, and 5 million m² of Right of Way. Tender price inflation running 2014 → 2029, one-page cost plans generated by artificial intelligence on command, and a 1,900-strong tier-classified directory of the firms who design and deliver the region’s projects. Hard costs and soft costs. Updated quarterly. Audited to Royal Institution of Chartered Surveyors standards.

250,000+
Priced rates
$15 billion
Benchmarked cost
4 million m²
Gross Floor Area
20 million m²
Total Developable Area
5 million m²
Right of Way
1,900+
Partner firms
Explore the platform
Trusted by
Government·Semi-government·Private developers·Main contractors·Subcontractors·Cost consultants·PMCs·Design consultants·Business planning & feasibility·Dispute resolution·Loss adjustors·Insurers·Banks·Academia
AI Enabled·POMI Classified·CESMM Infrastructure·NRM3 Aligned·TPI 2014 → 2029
The platform

Four modules.
One dataset.

Subscribe to each module on its own, in any combination, or take the Full Access bundle at a ~23% discount with four AI-generated cost plans included. Per-user licensing. Annual billing. Quarterly data refresh.

Module 01

Rates

$2,900per user, per year

243,000+ anonymised unit rates from live UAE and KSA tenders, classified under POMI (buildings) and CESMM (infrastructure). AI natural-language search. Filter by tier, employer class, currency, base year, procurement method.

  • Buildings · Infrastructure · Public Realm
  • Subscription-only access — no free trial
  • Citation generator for client reports
  • AED / SAR / USD toggle
  • Tier-based contractor filters
Learn more
Module 02

Benchmarking

$3,900per user, per year · incl. 4 cost plans

Elemental cost breakdowns across over 200 projects — buildings, infrastructure, public realm, plus standalone bridge and MSE wall benchmarks. Include-exclude any element for like-for-like totals. Inflation adjustment with quarterly CPI and TPI series.

  • GIA · GFA · BUA · GLA · TDA · ROW bases
  • Include / exclude any element
  • Inflation rebase to any quarter, any year
  • Δ% vs dataset average on every project
  • 4 AI cost plans per year included
Learn more
Module 03

Middle East Cost Averaging

$2,000per user, per year

Seven-market location-factor layer. UAE and KSA from direct tender data; Egypt, Kuwait, Qatar, Oman, and Turkey projected from the base. Discipline-specific factors, applied in dollar space, transparent on every result.

  • UAE · KSA · Egypt · Kuwait · Qatar · Oman · Turkey
  • Discipline-specific factors (Buildings / Infra / PR)
  • Applied in dollar space, net of VAT
  • Composes with inflation adjustment
  • Quarterly factor review
Learn more
Module 04

Partners

$1,000per user, per year

Market intelligence directory of 1,900+ regional firms — contractors, subcontractors, and consultants — tier-classified with specialisations. Filter by service line, tier, country.

  • 1,900+ tier-classified firms
  • 6 consultant service lines
  • HVAC, façade, landscape, MEP specialisations
  • Editorial bios + website links
  • Multi-discipline firms surface under every service
Learn more
Full Access bundle

All four modules · 4 cost plans · one subscription

Every rate, every benchmark, full location normalisation, the Partners directory, and four AI cost plans each year. Additional plans at $100 each.

$9,800
$6,000
per user, per year · ~23% off
See pricing
What Qeema does

Cost intelligence and market intelligence, end-to-end.

Qeema covers hard costs and soft costs. It tells you what something costs, what it should cost, what it used to cost, what it will cost, who will build it and who will design it — all in one platform, governed by a single methodology.

01

Benchmarking — elemental cost models

Hundreds of projects broken down element by element. Toggle GIA / GFA / BUA / GLA / TDA / ROW. Include or exclude any element for like-for-like totals. Every figure on every benchmark is defensible.

02

Rates — the pricing library

243,000+ anonymised priced rates from live UAE and KSA tenders, classified under POMI and CESMM. Filter by tier, employer class, procurement route, pricing mechanism, base date. Natural-language search.

03

Tender price inflation — 2014 → 2029

A TPI tool that uses the entirety of Qeema's dataset back to 2014 to forecast tender prices forward through 2029 Q4 — discipline-specific series for Buildings and Infrastructure, rebaseable to any quarter.

04

Central bank inflation option

Rebase in CPI space when the conversation is with a client who thinks in consumer-price terms. One toggle. Same quarter-level resolution. Separate UAE and KSA series.

05

AI cost plans on command

State the asset type and its characteristics — size, specification, procurement route — and Qeema produces a one-page elemental cost plan with comparables and a citation block. Seconds, not days.

06

Middle East cost averaging

Project costs from the UAE / KSA base dataset across five more regional markets — Egypt, Kuwait, Qatar, Oman, and Turkey — with discipline-specific location factors applied in dollar space.

07

Market intelligence — who delivers

A tier-classified directory of hundreds of consultants, contractors, and subcontractors. Categorised by capability and by tier. Understand the players in the market and the value they bring.

08

Hard costs and soft costs

Construction cost is only half the picture. Qeema covers the soft-cost layer alongside — consultant fees, PMC fees, cost-management fees, statutory charges — so total project cost is a single query.

09

One methodology, audited

Every number in Qeema is produced under one published methodology. RICS-aligned. POMI / CESMM / NRM3. Subscribers — and the clients they report to — can see exactly how any figure was derived.

Built for

Everyone who prices, funds, or delivers construction.

Qeema intends to be the go-to cost and market intelligence partner across the entire construction value chain — from the developer deciding whether to proceed, to the bank underwriting the loan, to the academic teaching the next generation.

Government
Semi-government
Private developers
Main contractors
Subcontractors
Cost consultants
Project management consultants
Design consultants
Business planning & feasibility consultants
Dispute resolution consultants
Loss adjustors
Insurance providers
Banks
Academia
Use cases

How Qeema gets used.

A short list of the questions Qeema is designed to answer. If you recognise the question, the platform shortens the path to the answer.

01
Developers

Early feasibility — pressure-testing the cost plan and challenging the assumptions behind it before board commitment.

02
Banks

Understanding costs and forecasts for construction funding requests so loan sizing stands up to internal credit review.

03
Academia

Teaching the next generation of cost professionals how construction cost is structured, classified, and moves over time.

04
Subcontractors

Understanding how a main contractor is pricing their work — and where there is margin to negotiate on a package submission.

05
Main contractors

Understanding subcontractor rate positioning before evaluating bids, so procurement conversations start from a defensible baseline.

06
Cost consultants

Filling gaps in knowledge on asset types or jurisdictions they don't price every day — a Dubai QS quoting a Riyadh hospital, a Buildings QS on a first infrastructure job.

07
Project management consultants

Challenging the cost consultant's assumptions on a live project — independent, same-dataset reference numbers to anchor the conversation.

08
Private developers

Understanding the market and the key players across design and delivery before shortlisting for a new project.

09
Loss adjustors & insurers

Establishing replacement value on an asset — modern equivalent construction cost, defensibly derived from comparable recent tenders.

Our methodology

Built on audited data and RICS-grade standards.

Qeema publishes a full methodology. Subscribers — and the clients they report to — can see exactly how every rate is sourced, classified, adjusted, and refreshed.

Confidentiality first

No project, developer, or contractor is ever named. Data is published with contractor tier, employer classification, and city-level location only. Low-volume locations are aggregated to preserve anonymity.

Standards aligned

Buildings classified under POMI. Infrastructure under CESMM. Areas measured per RICS Code of Measuring Practice 2015. Rates quoted in AED and SAR, natively.

Inflation adjusted

Compare a 2018 tender to a 2025 submission on like-for-like terms. Base-date adjustments built into every view, using regional construction inflation indices.

Elemental depth

Benchmarks break down to Substructure, Superstructure, Envelope, Mechanical, Electrical, Finishes, External Works, and more — not just an AED-per-square-metre figure.

Quarterly refresh

The dataset is refreshed every quarter with new tender, award, and completion data. Version-controlled, with change logs available to subscribers.

Regional focus

Purpose-built for the Gulf. UAE and KSA coverage, with dedicated data for Dubai, Abu Dhabi, Sharjah, Riyadh, Jeddah, and Gulf giga-projects.

Begin

See Qeema in action.

شاهد قيمة

Our specialists walk you through the platform, answer questions on methodology and coverage, and help you choose the right subscription for your practice.