Module 02 · Benchmarking

Elemental cost models. Like-for-like comparables. Cost plans in minutes.

Benchmarking breaks every project into NRM-aligned elemental components — substructure, superstructure, services, finishes, external works, prelims — and lets you compare projects on any area basis (GIA, GFA, BUA, GLA, TDA, ROW). Buildings, infrastructure, public realm, and standalone-asset benchmarks for bridges and MSE walls. Include or exclude any element for like-for-like comparison. Rebase to any quarter from 2014 Q1 to 2029 Q4. Four AI-generated cost plans included per year.

$3,900
per user / year · incl. 4 cost plans
Full pricing
How it looks

Redacted project card, exactly as subscribers see it.

AP-227 · Dubai · 2024
Apartments · BUA · Traditional · Lump Sum
T2
Substructure556 AED/m²
Superstructure1,334 AED/m²
Internal finishes1,080 AED/m²
Services1,390 AED/m²
External works293 AED/m²
General Requirements812 AED/m²
Total5,465 AED/m² BUA
Prelims/GR 14.9% · Δ +3.1% vs. dataset mean
AP-227 · Dubai · 2024 → 2026 Q3
UAE Buildings TPI · rebased
ADJUSTED
Substructure610 AED/m²
Superstructure1,465 AED/m²
Internal finishes1,186 AED/m²
Services1,526 AED/m²
External works322 AED/m²
General Requirements892 AED/m²
Total6,001 AED/m²+9.8%
Base date inferred from tender month → rebased quarterly
Each project is identified by its Qeema display code (AP-227 = Apartments, 227th in the set). No developer name, no contractor name, no city-sub-area. Procurement method and pricing mechanism are published as analytical lenses. Every element can be included or excluded from the total — untick “Chilled Water” and every project’s total recomposes automatically for like-for-like comparison.

Six area bases

GIA, GFA, BUA (buildings) · GLA (landscape) · TDA (infra developable) · ROW (infra corridor). Switch basis, totals recompose.

Include / exclude elements

Untick Chilled Water and every project's total drops by its chilled-water cost. Essential for like-for-like comparison across scopes that differ.

Quarterly inflation rebasing

Rebase to any quarter from 2014 Q1 to 2029 Q4. CPI or TPI. Discipline-specific TPI (Buildings vs Infra) so rebasing respects real market movement.

Side-by-side base vs adjusted

Hover any project and see an element-by-element table: base rate, adjusted rate, Δ%. Plus totals row. No more mental maths.

Over 200 benchmarked projects

150 buildings, 30 infrastructure (plus 6 bridges and 6 MSE walls as standalone assets), 36 public realm. Growing quarterly as new tenders complete and new projects are ingested.

Bridges & MSE walls

Box-girder and pile-supported bridges benchmarked per m² of deck area. MSE walls benchmarked on both panel-face area (primary) and ramp area (retained-soil basis). Full CESMM element breakdown — earthworks, piling, insitu concrete, precast, metalwork, ancillaries, waterproofing.

$100 per extra cost plan

After your 4 included plans, generate more at $100 each — billed to the card on file. No cap.

4 AI cost plans included

Type the scope. Get the plan.

Describe your project in plain English — “40,000 m² GFA apartment tower, Dubai, 2026 Q3 base date” — and Qeema queries your benchmarking dataset, applies location and inflation factors, and produces a one-page cost plan with elemental breakdown, comparables, and a citation block you can paste into a client report.

Four generations per year are included with the Benchmarking subscription. Additional plans are billed at $100 each.

Example output
Villa community · 40,000 m² GFA · Dubai · 2026 Q3
From comparables TH-043, VL-118, VL-236 (redacted)
Substructure485 AED/m²
Superstructure1,320 AED/m²
Internal finishes1,085 AED/m²
Services1,470 AED/m²
External works310 AED/m²
General Requirements780 AED/m²
Total5,450 AED/m²
Δ +3.8% vs. mean · TPI-rebased to 2026 Q3
Included with Benchmarking

Everything for $3,900.

Most popular module. Pair with Rates for full cost-plan workflow, or take Full Access for all four modules + 4 cost plans at $6,000.

  • Elemental breakdowns across over 200 projects
  • Standalone benchmarks for bridges (deck area) and MSE walls (panel + ramp)
  • GIA · GFA · BUA · GLA · TDA · ROW basis switcher
  • Include / exclude any element for like-for-like totals
  • Quarterly inflation rebasing (CPI + TPI)
  • Discipline-specific TPI (Buildings / Infra / Landscape)
  • Tooltip table: Element · Base · Adjusted · Δ%
  • 4 AI-generated cost plans per year
  • Prelims / General Requirements % per project
  • Procurement + pricing mechanism columns
  • Side-by-side project comparison (compare tool)
  • Citation generator for client reports
  • Subscription-only access — no free trial, no bulk export
  • Quarterly dataset refresh

See it before you subscribe.

30-minute walk-through on your actual pricing questions, using your own project parameters.