Video walkthrough

See the platform. Every figure redacted.

A 60-second auto-playing walkthrough of every Qeema module. Numbers are blocked out throughout — the dataset is the product and previewing it for free would compromise its commercial value. Layout, filters, and workflows are exactly as subscribers see them.

01 · The dataset
01 / 08
Figures redacted · Capabilities live
250,000+
Priced rates
$15 billion
Benchmarked cost
200+
Projects
4 million m²
Gross Floor Area
20 million m²
Total Developable Area
5 million m²
Right of Way
A quarter-million priced rates. Quarterly refresh.
Live UAE and KSA tender, award and completion records — anonymised at ingest, classified under POMI and CESMM, reconciled to RICS measurement standards.
01 · 01 · The dataset
The walkthrough loops automatically. Tap any segment in the progress bar to jump to that module. Use the pause button if you want to study a frame before it advances.
Or read the detailed walkthrough
STEP
01
The dataset

A quarter-million priced rates. Updated quarterly.

Qeema ingests live tender, award, and completion records from the UAE and KSA construction markets. Buildings classified under POMI, infrastructure under CESMM, public realm and giga-project work as standalone series. Every record is anonymised at ingest — no project name, no developer name, no contractor name.

250,000+
Priced rates
$15 billion
Benchmarked cost
200+
Projects
4 million m²
Gross Floor Area
20 million m²
Total Developable Area
5 million m²
Right of Way
Aggregate figures only — these don’t expose the underlying project records.
STEP
02
Rates

Type a rate question in plain English.

The Rates module accepts natural-language queries — no boolean syntax, no schema memorisation. Each result carries city, base year, tier, employer classification, procurement route, and pricing mechanism. Click a rate to see its citation block for client reports.

QueryC40 concrete to columns in Dubai 202412 matches
UAE · Dubai · 2024
T1
AED / m³
Qty ••• m³
C40 concrete to columns; pumped; including rebar chairs and ties; as specified
SectionConcrete · Columns
EmployerSemi-Government
RouteDesign-Build · Lump Sum
KSA · Riyadh · 2023
T2
SAR / m³
Qty ••• m³
Bulk excavation in rock; cart away to licensed dump; as specified
SectionEarthworks · Excavation
EmployerGovernment
RouteTraditional · Remeasure
UAE · Abu Dhabi · 2025
T1
AED / m²
Qty ••• m²
Rectangular ductwork, comply with SMACNA and statutory authority fire code; complete with fittings and turning vanes
SectionMechanical · Ductwork
EmployerPrivate
RouteTraditional · Lump Sum
STEP
03
Benchmarking

Element-by-element project comparables.

Every benchmarked project breaks down into NRM-aligned elements (substructure, superstructure, services, finishes, external works, prelims). Toggle area basis — GIA, GFA, BUA, GLA, TDA, ROW — and totals recompose. Include or exclude any element to compare like-for-like across projects with different scopes.

AssetApartments 28Villas 16Hospitality 9Offices 12BasisGIAGFABUA
Element
QEEMA · 7HZK
QEEMA · MQX2
QEEMA · D4FB
Substructure
Superstructure
Internal finishes
Services
External works
Prelims
Total per m² GIA
Display codes shown · cost figures redacted
STEP
04
Benchmarking

Stacked-bar visualisation. One bar per project.

Each project renders as a stacked bar — colour-coded by element. Hover any project to see element-by-element breakdown, base rate vs adjusted rate (after inflation rebasing), and Δ% versus the dataset average. Click an element in the legend to exclude it across every bar simultaneously.

Elemental cost by project · Apartments
28 projects · AED/m² GIA
Figures redacted
QEEMA · 7HZK
QEEMA · MQX2
QEEMA · D4FB
QEEMA · L8VC
QEEMA · PN3T
QEEMA · X5RJ
QEEMA · B2GW
QEEMA · K6YA
Substructure
Superstructure
Internal finishes
Services
External works
Prelims
STEP
05
Tender Price Inflation

Rebase to any quarter from 2014 Q1 to 2029 Q4.

Every benchmarked project carries a base date. Toggle CPI (FCSA / GASTAT) or TPI (Qeema's Tender Price Index, calibrated to matched-pair tender observation) and pick a target quarter. All values multiply by indexAtTarget / indexAtBase, including forecasted forward to 2029. Discipline-specific TPI series — Buildings tracks differently to Infrastructure.

Inflation adjustONRebase to2026Q2UsingTPI — BuildingsCPI
Nominal · base date
Substructure
Superstructure
Internal finishes
Services
External works
Total
Adjusted · 2026 Q2 · TPI
Substructure
Superstructure
Internal finishes
Services
External works
Total
STEP
06
Middle East Cost Averaging

Seven markets. One base dataset. One toggle.

UAE and KSA from direct tender data. Egypt, Kuwait, Qatar, Oman, Turkey projected via published location factors. Buildings carries the higher uplift, Infrastructure and Public Realm the lower one — specific values redacted here, on-screen at every result for subscribers. Applied in dollar space, net of VAT.

Location factorAs-isUAEKSA · ×
Source
UAE tender, 2024
AED / m² BUA
Uplift
Buildings KSA over UAE
×
Applied in dollar space
Normalised
KSA cost level
SAR / m² BUA
STEP
07
AI Cost Plan

One-page cost plans on command.

State the asset type and its characteristics — size, specification, procurement route, location — and Qeema produces a one-page elemental cost plan with comparables and a citation block. Seconds, not days. Backed by Qeema's benchmark library so every figure has a defensible basis.

Prompt

30-storey residential tower in Dubai Marina, 65,000 m² GIA, upper-mid specification, design-build procurement, target award Q3 2026.

Cost Plan · Apartments · Dubai · Q3 2026
AI-generated, methodology cited
Total
Substructure
Superstructure
Internal finishes
Services
External works
Prelims
Comparable basket: 14 projects · Q1 2022 → Q4 2024 · rebased to Q3 2026 via Qeema TPI. Methodology §06 · §07 · §08.
STEP
08
Partners

The firms who build the region, tier-classified.

A directory of 1,900+ contractors, subcontractors, and consultants across UAE and KSA — classified by service line, tier (T1/T2/T3), and specialisation. Filter by HVAC, façade, landscape, MEP, fit-out, and twenty more capability tags. Multi-discipline firms surface under every service they offer.

FilterContractorsSubcontractorsConsultantsT1T2FaçadeMEPLandscape
Omnium International
T1
UAE · KSA

Independent cost consultancy with regional offices in Dubai and Riyadh — covers PMC and cost management across hospitality, residential, and giga-project work.

Cost ManagementPMC
ALEC Engineering & Contracting
T1
UAE

Tier-1 main contractor with track record across landmark hospitality, residential and aviation projects.

ContractorHospitalityAviation
Desert Landscape
T2
UAE

Specialist landscape contractor — public realm, hardscape, irrigation systems across UAE municipal portfolios.

LandscapeSubcontractor
Partner names are public — the directory is intentionally open. Confidentiality in Qeema applies to project costs, not the firms who delivered them.
STEP
09
Methodology & confidentiality

Audited to RICS standards. No project ever named.

The full methodology is published. POMI for buildings, CESMM for infrastructure, NRM-aligned elemental breakdown, RICS Code of Measuring Practice 2015 areas. No project, developer, or contractor is ever named. Drawing references and statutory authorities are scrubbed at ingest. City-level anonymisation; low-volume locations rolled up.

Confidentiality first

No project, developer, or contractor is ever named on a rate or benchmark. City-level only; low-volume cities are rolled up to preserve anonymity.

Standards aligned

Buildings under POMI, infrastructure under CESMM, NRM-aligned elemental breakdowns. Areas measured per RICS Code of Measuring Practice 2015.

Inflation transparent

CPI tracks FCSA / GASTAT actuals. TPI calibrated to matched-pair tender observation. Both forecast forward to 2029 Q4 with published methodology.

Quarterly refresh

New tender, award, and completion data ingested every quarter. Version-controlled with change logs. Subscribers see a clear audit trail.

Subscription-only access

No free trial. The dataset is the product. Walkthroughs and live demonstrations are how the platform is evaluated before subscription.

Audit on request

Subscribers can request the methodology dossier covering ingest, anonymisation, classification, and refresh cadence — usable in client reports and on professional indemnity questionnaires.

Walkthrough complete

Ready to see the figures?

Every number that was redacted on this page is live to subscribers. Book a 30-minute live walkthrough on your own project, or jump straight to pricing.

See pricing